All PM / EAM (Plant Maintenance) interview questions in one place, grouped by page. Read the page when an answer needs more depth.
How to practise: cover the answer, say yours out loud in 30–60 seconds, then compare.
01 · PM / EAM Overview, Architecture & Organization Structure
Q1. What is PM / EAM and what are its main sub-areas?
Plant Maintenance (in S/4HANA: Maintenance Management in Asset Management) keeps physical assets running. Sub-areas: technical objects, notifications, maintenance orders, maintenance planning (preventive), work clearance management, refurbishment, calibration with QM and the information system.
Q2. Explain the maintenance strategies and how SAP supports each.
Corrective (notification → order), preventive time-based (single cycle or strategy plan, IP30), counter-based (counter measuring points + performance-based or multiple counter plan), condition-based (measuring points with limits + measurement documents), predictive (APM on BTP with IoT and ML) and risk-based (criticality, FMEA / RCM deciding the strategy per asset).
Q3. What is the difference between a maintenance plant and a maintenance planning plant?
The maintenance plant is where the technical objects are installed (ILOA-SWERK). The planning plant is where the work is planned: notifications, orders, task lists, plans and planner groups belong to it (IWERK). One planning plant can plan for several maintenance plants (centralised planning).
Q4. What is a planner group and what is a main work center?
A planner group (T024I, per planning plant) is the team of planners responsible for the object or order. The main work center (CRHD) is the group that executes the work; it supplies capacity and the activity type used to cost confirmed hours.
Q5. What is table ILOA used for?
It holds location and account assignment data (maintenance plant, location, plant section, company code, business area, cost center, asset, WBS) shared by functional locations, equipment, notifications and orders through the ILOAN key. Installed equipment can inherit it from the functional location.
Q6. Which modules does PM integrate with?
MM (reservations, goods issue 261, purchase requisitions for non-stock parts and services), CO (order costs and settlement), FI-AA (asset link), HCM / CATS (time confirmations), PS (WBS), QM (calibration, shared notification and catalog framework), PP (work center capacity), SD / Service (service orders) and BTP products such as APM and mobile.
Q7. What are the standard notification types?
M1 maintenance request, M2 malfunction report, M3 activity report (documents work already done). Customers usually copy them into their own types.
Q8. Why does the planning organization matter to a developer?
Planning plant, planner group and order type are the main selection and authorization fields (objects I_IWERK, I_INGRP …). Every custom report, workflow and interface filters by them, and centralised planning means orders of one planning plant can belong to several maintenance plants.
Q9. Where does EAM run in S/4HANA, and what runs on BTP?
Maintenance Management is embedded in the S/4HANA core (same system and database as MM and FI). On BTP run SAP Asset Performance Management (asset health, predictive, FMEA / RCM), SAP Business Network Asset Collaboration (shared asset data) and the SAP Service and Asset Manager mobile app.
Q10. What is work clearance management?
The PM component that makes work safe: isolation of equipment (lockout / tagout) and approvals before execution, with work clearance applications and documents linked to the order. It is available on-premise and in private cloud, not in public cloud.
Q11. How does calibration connect PM and QM?
Test equipment (equipment category for test equipment) gets a maintenance plan; the call creates a maintenance order and an inspection lot with origin 14. Results and the usage decision are entered in QM and can update the equipment status.
Q12. As an architect, when would you use centralised planning?
When one planning department and one spare-parts store serve several sites with similar assets – fewer planner groups and task lists to maintain. Large, independent sites with their own planners are better modelled as their own planning plants.
02 · Master Data & Data Model
Q1. What is the difference between a functional location and an equipment?
A functional location is a place in the technical structure where an object can be installed; it keeps the history of the place. Equipment is an individual physical object with its own history that can be installed, dismantled and moved. Tables: IFLOT / IFLOTX vs EQUI / EQUZ / EQKT.
Q2. What is a structure indicator?
Customizing for functional locations that defines the edit mask of the label and its hierarchy levels, so the system derives the superior functional location (IFLOT-TPLMA) from the label.
Q3. Why does EQUZ exist next to EQUI?
EQUZ stores time segments: every change of history-relevant data (installation location, planning plant, cost center) closes the current row and creates a new one. The current data is the row with DATBI = 99991231, joined to ILOA for location and account assignment.
Q4. How are serial numbers and equipment related?
A serial number is material + serial number stored in EQUI with an equipment number; with the right serial number profile it gets full equipment data. EQBS holds its stock information, OBJK / SER0x link it to documents.
Q5. Which PM BOMs exist and how are they linked?
Equipment BOM (IB01, link table EQST), functional location BOM (IB11, TPST) and material BOM used as maintenance assembly (CS01, MAST). All use STKO / STPO; BOM usage 4 is plant maintenance.
Q6. What are the task list types?
A general maintenance task list (IA05), E equipment task list (IA01), T functional location task list (IA11). Header PLKO, operations PLPO, components PLMZ, allocations EAPL / TAPL / MAPL.
Q7. Which tables hold a maintenance plan and its calls?
MPLA header with scheduling parameters, MPOS items, MMPT cycles, MHIS scheduling history per call, MHIO call objects. The order points back via AFIH-WARPL and AFIH-ABNUM.
Q8. What is the difference between a measuring point and a counter?
A measuring point records any value (temperature, pressure) with optional limits; a counter is a measuring point whose reading only increases (hours, km) and drives performance-based scheduling. Both are in IMPTT; readings are measurement documents in IMRG.
Q9. Name the notification tables.
QMEL header, QMIH maintenance data (equipment, breakdown, malfunction times), QMFE items with object part and damage, QMUR causes, QMMA activities, QMSM tasks; codes from catalogs in QPGR / QPCD / QPCT.
Q10. Which tables make up a maintenance order and how do you read its status?
AUFK (AUTYP 30), AFIH, AFKO, AFVC / AFVV operations, RESB components, AFRU confirmations, OBJK object list. Status is in JEST by OBJNR (I0002 REL, I0045 TECO, I0046 CLSD …), read with STATUS_READ or a join on JEST with INACT = space.
Q11. What should new S/4HANA code use instead of the PM tables?
Released CDS views such as I_Equipment, I_FunctionalLocation, I_MaintenanceOrderDEX (RAP BO I_MaintenanceOrderTP) and the maintenance notification / plan / measuring point views, and the released OData APIs for writes. Check the release contract (C1) before using a view.
Q12. As an architect, how do you decide between functional locations and equipment only?
Use functional locations when places have their own life (positions in a plant or network where units are swapped) and costs or history are reported per place; use equipment alone for loose, mobile assets such as vehicles or tools. Most plants use both: FL hierarchy + installed equipment.
03 · Business Processes & Configuration
Q1. Walk through the corrective maintenance process with t-codes.
Notification IW21 → order IW31 / IW34 → plan operations, components, services in IW32 → release → goods issue MIGO 261 and purchasing for external work → time confirmation IW41 / IW44 (or IW42) → TECO → settlement KO88 / KO8G → business completion (CLSD).
Q2. What is the difference between TECO and CLSD?
TECO means the work is done: open reservations and capacities are removed, but costs can still be posted and the order must be settled. CLSD (business completion) blocks all further postings and needs a zero balance after settlement.
Q3. What happens when an order is released?
Status REL is set: goods issues and confirmations become possible, reservations become relevant for withdrawal, purchase requisitions are created if set to "at release", a settlement rule is generated and shop papers can be printed.
Q4. How are stock and non-stock components handled?
Stock items (item category L) create a reservation in RESB and are withdrawn with movement type 261. Non-stock items (N) and external operations (control key PM02 / PM03) create purchase requisitions that become purchase orders; costs come from the goods receipt or service entry.
Q5. Explain IP10 and IP30.
IP10 starts or restarts scheduling of a single maintenance plan. IP30 (report RISTRA20) is deadline monitoring for many plans, run periodically in background; it calls all plans whose dates fall in the call horizon. In S/4HANA IP30H preselects due plans and runs in parallel.
Q6. What is the call horizon and the completion requirement?
The call horizon decides how early (as a percentage of the cycle) the call object is created. The completion requirement makes the next call wait until the previous call object is completed.
Q7. How does condition-based maintenance work in SAP?
Measuring points carry limits; readings are recorded as measurement documents. A reading outside the limit leads to a notification – created with the reading, by the condition-based maintenance function in S/4HANA Cloud, by custom logic in the measurement document exit, or by SAP Asset Performance Management on BTP. Counter readings drive performance-based plans.
Q8. What is the phase model in S/4HANA maintenance?
A process layer with nine phases – initiation, screening, planning, approval, preparation, scheduling, execution, post execution, completion – each with roles and Fiori apps. Phase control codes govern transitions; emergency and minor work skip phases. Cloud from 2011, on-premise from 2021, optional per type on-premise.
Q9. Which settings does the order type control?
Number range, settlement profile, status profile, costing, release behaviour, refurbishment indicator, allowed maintenance activity types, notification link and (S/4HANA) the phase model flag. Order types are assigned to planning plants.
Q10. What is a refurbishment order?
An order type with the refurbishment indicator for repairing rotable spare parts. The material is split-valuated; the defective part is issued and received back in the refurbished valuation type at a different value.
Q11. What is the settlement profile and where does the settlement rule come from?
The settlement profile (OKO7, assigned to the order type) defines allowed and default receivers. At release the system creates the settlement rule, usually to the cost center of the technical object; KO88 / KO8G settle the actual costs.
Q12. As an architect, classic process or phase model on-premise?
Phase model when the customer wants Fiori-based roles, approvals, backlog and scheduling apps and a path to cloud best practices; classic when heavy SAP GUI processes, custom code and integrations built on IW21 / IW31 must be kept. Both run on the same tables, so a gradual move per order type is possible.
04 · Integration, Reporting & Analytics
Q1. What happens in MM when you add a stock and a non-stock component to a maintenance order?
The stock item (category L) creates a reservation in RESB, later consumed by goods issue 261 to the order. The non-stock item (N) creates a purchase requisition with account assignment F; the PO and goods receipt post the cost directly to the order. Timing depends on the reservation / requisition relevance setting (never, from release, immediately).
Q2. What is the difference between control keys PM01, PM02 and PM03?
PM01 is internal processing by an own work center (confirmation posts activity costs). PM02 is external processing of a whole operation – a purchase requisition is created. PM03 is external service with a service specification – requisition with service lines and a service entry sheet.
Q3. How are maintenance costs settled?
The order collects plan, commitment and actual costs; at period end KO8G (or KO88) settles them per settlement rule (COBRA / COBRB) to cost center, asset, WBS element or AuC. The rule is usually derived from the reference object's cost center; IWO10027 can build a custom rule. After TECO and final settlement the order is set to CLSD.
Q4. What is an investment order and how does it reach the fixed asset?
An order with an investment profile (or assigned to an investment program). It settles periodically to an asset under construction; after completion a full settlement distributes the costs to the final fixed assets. The decision repair vs capitalise is agreed with finance.
Q5. Where do you find maintenance order costs in S/4HANA?
As line items in ACDOCA (field AUFNR); the ECC totals tables are compatibility views. For reports use the cube I_MaintOrderActualCostDataCube (classic API, not released for ABAP Cloud) or the Fiori apps Maintenance Order Costs / Actual Cost Analysis.
Q6. How is a shutdown (turnaround) handled?
A PS project with WBS elements holds budget and controlling; maintenance orders are assigned to WBS elements and grouped by a revision for the outage window. Large turnarounds add networks for project activities. In S/4HANA event-based planning buckets help to plan and track the outage backlog.
Q7. Describe the calibration process with QM.
Test equipment has a maintenance plan with a task list containing inspection characteristics. The order release creates an inspection lot with origin 14; results are recorded and the usage decision triggers follow-up actions such as an equipment status change or a repair notification.
Q8. How do hours from CATS reach a maintenance order?
Time is entered in CAT2 (CATSDB), transferred with CAT9 (RCATSTPM) or CATA to the PM/CS interface table CATSPM, which creates order confirmations (AFRU) and activity allocations.
Q9. Which mobile solution does SAP offer for maintenance today?
SAP Service and Asset Manager: native, offline-capable app built with the mobile development kit on SAP BTP mobile services, connected through the SAP Mobile Add-On for S/4HANA. SAP Work Manager is the legacy product; Fiori apps cover online scenarios.
Q10. How does predictive maintenance integrate with S/4HANA?
Sensor and measurement data are analysed in SAP Asset Performance Management on BTP. Alerts or risk results create maintenance notifications in S/4HANA through APIs; readings are stored as measurement documents that can drive performance-based plans.
Q11. Which standard reports do you know for PM, and what is PMIS?
IW28/IW29 notifications, IW38/IW39 orders, IW37N operations, IH06/IH08 technical objects, IP24 plan scheduling overview. PMIS is the LIS-based information system (S061–S115, MCI1–MCI8, MCJB/MCJC for MTTR / MTBR) – legacy, replaced by CDS-based embedded analytics.
Q12. A user wants a breakdown KPI dashboard across two plants. How do you build it?
If both plants are in one S/4HANA system: Fiori Technical Object Breakdowns or a custom analytical query on released cubes. If data comes from several systems or needs long history and sensor data: SAP BW/4HANA, Datasphere or SAP Analytics Cloud. Either way ensure malfunction reports carry the breakdown flag and times.
05 · Development & Extensibility
Q1. Which user exits have you used in PM orders?
IWO10009 for checks at save, IWO10002 at release, IWO10004 at TECO, IWO10027 for a custom settlement rule, IWO10018 for user fields on the header, IWO10012 for priority handling on the order header. They are customer exits (SMOD / CMOD), function exits EXIT_SAPLCOIH_0nn.
Q2. How do you check notification data before saving?
Exit QQMA0014 (error stops the save) or BAdI NOTIF_EVENT_SAVE for changes at save. QQMA exits are shared with QM and service notifications and are not called from the Fiori notification apps, so filter by notification type and test every channel.
Q3. Which methods does WORKORDER_UPDATE have and where may you raise an error?
AT_SAVE, AT_RELEASE, BEFORE_UPDATE, IN_UPDATE (and others). Only AT_SAVE may issue an error message, with RAISING error_with_message; errors in BEFORE_UPDATE run in the update and dump with SYSTEM_ON_COMMIT_INTERRUPTED. The BAdI also runs for production orders – check the order category.
Q4. Explain the methods table of BAPI_ALM_ORDER_MAINTAIN.
Each row says OBJECTTYPE (HEADER, OPERATION …), METHOD (CREATE, CHANGE …), OBJECTKEY (order number, or %00000000001 for a new order; operations order + activity) and REFNUMBER, the row index in the data table. A SAVE row is mandatory, a new order needs at least one operation, and the caller commits.
Q5. How do you get the final order number after creating an order with the BAPI?
From ET_NUMBERS: AUFNR_IN is the temporary number, AUFNR_NEW the final one – valid after BAPI_TRANSACTION_COMMIT.
Q6. Why does BAPI_ALM_NOTIF_CREATE alone not save a notification?
It only creates it in memory with a temporary number. BAPI_ALM_NOTIF_SAVE with that number saves it and returns the final number, and BAPI_TRANSACTION_COMMIT writes it to the database.
Q7. Which BAPIs create technical objects, and what do they not cover?
BAPI_EQUI_CREATE and BAPI_FUNCLOC_CREATE (DATA_GENERAL of type BAPI_ITOB, DATA_SPECIFIC of type BAPI_ITOB_EQ_ONLY / BAPI_ITOB_FL_ONLY), BAPI_EQUI_INSTALL for the installation. Classification values are not covered – use the classification BAPIs afterwards.
Q8. Is there an inbound IDoc for maintenance orders?
No standard one. IORDER01 is outbound (transaction IORD). Inbound orders use BAPI_ALM_ORDER_MAINTAIN, API_MAINTENANCEORDER or a BAPI-generated ALE interface.
Q9. Which OData APIs exist for PM?
API_MAINTENANCEORDER (OData V2; public cloud: successor Maintenance Order OData V4), API_MAINTNOTIFICATION, API_EQUIPMENT, API_FUNCTIONALLOCATION, API_MAINTENANCEPLAN, API_MEASURINGPOINT, API_MEASUREMENTDOCUMENT and further ones for task lists, items and confirmations – grouped in communication scenarios SAP_COM_0395 to 0398.
Q10. How do you select released maintenance orders that are not technically completed?
Join AUFK (AUTYP 30) with AFIH / AFKO and check JEST: active status I0002 (REL) exists and no active I0045 (TECO) or I0046 (CLSD). STATUS_TEXT_EDIT gives the status line as text.
Q11. A customer wants a mandatory field on the maintenance order in S/4HANA Cloud. What do you do?
Custom Fields (if a new field) and field control through the released BAdI EAM_ORDER_FIELD_CONTROL or the offered Custom Logic; no CMOD exits or modifications in the public cloud.
Q12. What typical RICEFW objects do you find in a PM project?
Work list and KPI reports, interfaces to mobile, SCADA and GIS, migration of technical objects and plans, release / save checks and settlement rules, shop papers, approval workflows and mass scheduling jobs.
06 · S/4HANA, Cloud & Architect View
Q1. What changed in PM with S/4HANA?
The PM core (objects, tables, transactions) is largely unchanged. Changes come from the surroundings – MATDOC, ACDOCA, business partner, 40-character material number – and from new capabilities: Fiori apps, maintenance requests, the phase model, planning buckets, scheduling board and embedded analytics.
Q2. How do you find the simplification items relevant for PM?
SAP Readiness Check and the Simplification Item Catalog filtered on Asset Management for the target release; classic functions like WCM against the compatibility scope note; custom code with ATC S/4HANA checks.
Q3. Which Fiori apps support maintenance planning and scheduling?
Manage Maintenance Planning Buckets (operational or event-based), Manage Maintenance Backlog, Maintenance Scheduling Board (Gantt), Manage Work Center Utilization, Manage Schedule and Assign Maintenance Order Operations; technicians use Perform Maintenance Jobs.
Q4. What maintenance scope does the public cloud offer?
Scope items 4HH reactive, 4HI proactive, 4VT improvement and 4WM operational and overhead maintenance on the phase model; the older BH1 / BH2 / BJ2 are deprecated since 2302. No WCM, Fiori only, extensions only with released objects.
Q5. Which migration objects exist for PM and in which order do you load them?
Predecessors product, work center, characteristics, material BOM; then functional locations, equipment, FL / equipment BOMs, measuring points and documents, task lists, maintenance plans (then start scheduling), open notifications. Open orders: migration object PM - Maintenance order (CRTD / REL orders) or recreate by program.
Q6. Functional location or equipment – how do you decide?
Functional location for the place / function and its cost and history; equipment for the individual, exchangeable asset with its own history, serial number or plan. Fix the structure indicator early.
Q7. When would you skip notifications and work order-only?
For planned and preventive work or very small jobs. For breakdowns keep notifications – they carry damage and cause codes and the breakdown flag needed for MTTR / MTBR.
Q8. Classic process or phase model on-premise?
Phase model when the customer wants role-based Fiori apps, request screening, approval workflow and the planning / scheduling apps; classic when processes are stable, GUI-based and heavily customised. It is activated per notification / order type.
Q9. How do you design predictive maintenance?
Start with measuring points and condition-based plans in S/4HANA; add SAP APM on BTP for sensor data, risk and reliability analysis. APM creates notifications in S/4HANA through APIs; S/4HANA remains the execution system.
Q10. How do you set up a refinery turnaround in S/4HANA?
PS project with WBS elements for budget and cost control; maintenance orders assigned to WBS elements and a revision for the outage window; event-based planning buckets and the scheduling board for planning; networks only for project activities.
Q11. Which mobile solution would you propose?
SAP Service and Asset Manager for technicians who need offline work, readings and standard content; Fiori apps for online, occasional users; partner apps only with a clear gap. Extensions go into the MDK app and the mobile add-on services.
Q12. How do you keep PM extensions clean-core?
Custom Fields and released BAdIs instead of CMOD exits and screen modifications, released CDS views and APIs instead of table reads and IDocs, side-by-side apps on BTP for new processes; classic extensions only on-premise, documented and tracked with ATC.