All SDLC, Scrum & the SAP Developer's Day interview questions in one place, grouped by page. Read the page when an answer needs more depth.

How to practise: cover the answer, say yours out loud in 30–60 seconds, then compare.

01 · SDLC & Delivery Models – Waterfall, Agile & SAP Activate

Q1. What is the SDLC and what are its phases?

The software development life cycle: the activities that turn a need into running software – requirements, design, build, test, deploy and maintain. Waterfall runs them once in sequence; agile runs small slices of them in every sprint.

Q2. Waterfall vs agile – when would you choose which?

Waterfall suits stable, well-known requirements with fixed scope and strong audit needs. Agile suits changing or unclear requirements where early feedback matters. SAP projects usually combine them: phases and quality gates outside, sprints inside.

Q3. What is the V-model?

A waterfall variant where each design level has a matching test level: requirements ↔ UAT, functional design ↔ SIT, technical design ↔ integration test, detailed design ↔ unit test. Test cases are prepared together with the design.

Q4. Name the phases of SAP Activate.

Discover, Prepare, Explore, Realize, Deploy, Run. Quality gates close the phases; fit-to-standard happens in Explore, sprints in Realize, cutover, go-live and hypercare in Deploy.

Q5. What is a fit-to-standard workshop?

An Explore-phase workshop where consultants demonstrate the SAP standard process (Best Practices scope items) and key users confirm it fits or name the gaps. The gaps become delta requirements in the backlog for Realize.

Q6. What is the difference between fit-to-standard and the old blueprint approach?

The ASAP business blueprint documented the customer's processes first and then designed SAP to match, often leading to heavy customising and custom code. Fit-to-standard starts from SAP's standard and only accepts justified gaps – which supports a clean core.

Q7. Greenfield, brownfield, bluefield?

Greenfield: new implementation from scratch. Brownfield: system conversion of the existing ECC system. Bluefield: selective data transition – a mix of new design and selected data and settings from the old system.

Q8. What is the difference between a functional and a technical specification?

The FS describes what the business needs (rules, fields, layouts, scenarios) and is written by the functional consultant. The TS describes how the developer builds it (objects, logic, tables, APIs, error handling) and is written by the developer.

Q9. What are SIT and UAT?

System integration testing checks end-to-end processes across modules and interfaces, run by the project testers. User acceptance testing is the business confirming the solution is fit for use before go-live.

Q10. What is cutover and what is hypercare?

Cutover is the planned sequence of steps that moves the solution into production: transports, data migration, jobs, checks and go/no-go decisions. Hypercare is the period of intensified support right after go-live before hand-over to normal support.

Q11. Who do you work with most as an ABAP developer?

The functional consultant (requirements, FS, testing), the technical lead (design and code review), BASIS (transports, systems), security (authorisations), testers (defects) and, in demos and UAT, the key users.

Q12. How does SAP Activate differ for the public cloud?

The public cloud roadmap uses mandatory scope items, Central Business Configuration instead of SPRO, only released APIs and ABAP Cloud for extensions, and SAP-scheduled upgrades. Private cloud and on-premise allow SPRO and classic ABAP, with clean core recommended.

02 · Scrum Framework – Roles, Events & Artifacts

Q1. What is Scrum?

A lightweight framework, defined in the Scrum Guide, for delivering value in fixed Sprints of one month or less. It is built on empiricism (transparency, inspection, adaptation) and has three accountabilities, five events and three artifacts with their commitments.

Q2. What are the Scrum accountabilities and who is the Scrum Master?

Product Owner (value, orders the Product Backlog), Scrum Master (Scrum's and the team's effectiveness) and Developers (a usable Increment every Sprint). The Scrum Master is a true leader who serves (Scrum Guide 2020; earlier “servant leader”), coaches and removes impediments – not a project manager who assigns tasks.

Q3. How big is a Scrum Team?

Typically 10 or fewer people, including the Product Owner and the Scrum Master. Larger efforts are split into several teams sharing one Product Goal, Product Backlog and Product Owner.

Q4. Name the Scrum events and their time-boxes.

The Sprint (one month or less), Sprint Planning (max 8 hours), Daily Scrum (15 minutes), Sprint Review (max 4 hours) and Sprint Retrospective (max 3 hours) – maximums for a one-month Sprint, shorter for shorter Sprints.

Q5. Is backlog refinement a Scrum event?

No. It is an ongoing activity in which the team splits and details upcoming Product Backlog items and sizes them, so they are ready for Sprint Planning.

Q6. What is the difference between the Sprint Review and the Retrospective?

The Review inspects the product – the Increment – with stakeholders and adapts the Product Backlog. The Retrospective inspects the way of working – people, process, tools, Definition of Done – and plans improvements. They are two separate events, Review first.

Q7. What are the artifacts and their commitments?

Product Backlog → Product Goal; Sprint Backlog → Sprint Goal; Increment → Definition of Done.

Q8. Definition of Done vs Definition of Ready?

The Definition of Done is in the Scrum Guide: the quality standard every Increment must meet. The Definition of Ready is a common team practice: the conditions an item must meet before it is taken into a Sprint, such as clear acceptance criteria and a signed-off specification.

Q9. What are story points and velocity?

Story points are a relative size of a backlog item (effort, complexity, uncertainty), usually on a Fibonacci-like scale, estimated with planning poker. Velocity is the points Done per Sprint, used to forecast – never to compare teams.

Q10. How do you read a Sprint burndown chart?

It plots remaining work against Sprint days with an ideal line to zero. Above the ideal line the team is behind, below it the team is ahead; a flat line means nothing is being finished.

Q11. Scrum vs Kanban?

Scrum works in fixed Sprints with defined accountabilities and events. Kanban is continuous flow with a board, WIP limits and flow metrics such as lead and cycle time. Kanban suits support work, Scrum suits project delivery; Scrumban mixes both.

Q12. How is Scrum used in an SAP S/4HANA project?

Within SAP Activate: fit-to-standard in Explore fills the backlog, Realize runs 2-week Sprints that build configuration and developments and demo them to key users, while quality gates, SIT, UAT and cutover remain phased. Large programmes may coordinate teams with SAFe PI planning.

03 · Work Items, Tools & Change Management

Q1. Explain the work-item hierarchy you used in your project.

Super Epic → Epic → Feature → PBI → Task in Azure DevOps. Epic, Feature, PBI and Task are the standard levels of the ADO Scrum process; the Super Epic was a project-specific level on top for a whole stream. Features are delivered over a few sprints, PBIs fit in one sprint and are estimated in story points, tasks are hours of work for one developer.

Q2. What is the difference between an epic, a feature, a user story and a task?

An epic is a large business goal; a feature is a deliverable capability that can be demonstrated; a user story (PBI) is a small piece of user value finished in one sprint; a task is a technical step for one person, estimated in hours.

Q3. What makes a good user story?

The format "As a … I want … so that …", the INVEST qualities (independent, negotiable, valuable, estimable, small, testable) and clear acceptance criteria, often written as Given – When – Then scenarios that testers can check.

Q4. What is the difference between an incident, a problem, a change and a service request?

An incident is an unplanned interruption – restore service fast. A problem is the root cause of one or more incidents. A change adds, modifies or removes something that can affect the service and needs approval. A service request is a predefined user request; in ServiceNow it is a REQ with one RITM (requested item) per catalog item and SCTASKs for fulfilment.

Q5. What are standard, normal and emergency changes?

Standard: low-risk, pre-authorised and repeatable. Normal: assessed and approved by the change authority or CAB before implementation. Emergency: must go in immediately, e.g. for a P1 incident, skips the peer / group review and goes straight to CAB authorization.

Q6. What is the difference between a workbench and a customizing request?

A workbench request carries repository objects and cross-client customizing; a customizing request carries client-specific customizing. Each user has a task under the request; tasks are released first, then the request, which exports the objects for import into QAS and PRD.

Q7. What is ChaRM and which change document types does it have?

Change Request Management in SAP Solution Manager: a Request for Change is approved and then change documents carry the transports – normal change (SMMJ), urgent change (SMHF), defect correction (SMTM), administrative (SMAD) and general change (SMCG). Transports are created and imported from the change document, which gives approval control and an audit trail.

Q8. How does SAP Cloud ALM handle changes compared with ChaRM?

Cloud ALM uses features as the unit of change and deployment: requirements and user stories link to a feature, transports are assigned to it, and the feature is approved and deployed to QAS and PRD. It is SaaS and SAP's recommended successor, since Solution Manager 7.2 mainstream maintenance ends in 2027.

Q9. What is retrofit and when is it needed?

In a dual landscape (maintenance line and project line) every fix made in the maintenance line must be copied to the project line so it is not lost at go-live. Objects untouched in the project line are imported automatically, customizing via BC Sets, and objects changed in both lines are merged manually.

Q10. Describe the change process in your last project.

Example answer: a functional consultant raised a CR for new functionality or a PR for a bug in the customer's change tool; if the change was needed in both paths a retrofit request (RR) was linked; I created a change transport (CT), attached the CR / PR and added my transport requests, so their status through DEV, QAS and PRD was tracked in one place. The work itself was a PBI with tasks in Azure DevOps.

Q11. How do you make a change traceable from requirement to production?

Put the ticket number in every transport description and work item, keep FS, TS, test evidence and approvals on the ticket, and use the change tool (ChaRM, Cloud ALM or the customer's tool) for approvals before the PRD import. E070 / E07T / E071 and version management show which objects changed.

Q12. A transport fails in QAS with return code 8. What do you do?

Read the import log in STMS: typical causes are syntax or activation errors, or objects that depend on a request not yet imported. Fix in DEV with a new request (or ask for the missing request to be imported first), never by editing in QAS, and tell the testers and the release manager.

04 · A Day in the Life of an SAP Developer

Q1. Walk me through a typical day in your project.

Check mails, tickets and overnight dumps; daily stand-up; update my tasks on the ADO board; then a focus block for analysis and development in ADT; a call with the functional consultant on open spec points; unit testing or QA defect fixes in the afternoon; ATC and peer review; documentation and a status update or hand-over to the offshore team.

Q2. Describe the lifecycle of a development from FS to go-live.

FS review and questions → estimate → TS / design → build in DEV on a transport → unit test → code review and ATC → release the transport → SIT in QAS with defect fixing → UAT and sign-off → cutover and go-live → hypercare and hand-over to support.

Q3. What do you do when the functional spec is unclear?

List the open points with concrete examples, check what I can find myself (tables, standard behaviour), then clarify them with the functional consultant in a short call and confirm the answers in writing on the ticket or in an updated FS. I do not build on assumptions.

Q4. What is the difference between unit test, SIT, regression test and UAT?

Unit test: the developer tests one object in DEV. SIT: testers check end-to-end processes and interfaces in QAS. Regression: proves existing functions still work after a change. UAT: key users confirm the solution meets business needs and sign off.

Q5. What is the difference between severity and priority?

Severity is the technical impact, priority is the business urgency. A crash in a rarely used year-end report is high severity but low priority; a wrong logo on customer invoices is low severity but high priority.

Q6. What is the lifecycle of a defect?

New → assigned → in progress → fixed (transport in QAS) → retest → closed; if the retest fails it is reopened. It can also be rejected (works as designed), marked duplicate or deferred to a later release.

Q7. What are L1, L2 and L3 support?

L1 is the service desk that logs tickets and solves known issues; L2 is functional support that analyses, reproduces and fixes data or configuration; L3 are developers and specialists who fix code and find root causes. Errors in SAP standard go to SAP support.

Q8. A P1 incident is raised: billing dumps in production. What do you do?

Join the incident call, collect facts, analyse the dump in ST22 (error, program, line, variables) and related logs, propose a workaround to restore business, then fix in DEV, test quickly in QAS, get emergency approval and import only that transport. Afterwards: root-cause note, retrofit if needed, and a problem record.

Q9. How do you estimate a development?

Stories in story points relative to a reference story, using planning poker in the team; tasks in hours covering analysis, TS, build, unit test, review and defect support. Unknowns get a time-boxed spike, and I flag risks with the estimate.

Q10. What do you do if you cannot finish your task in the sprint?

Raise it as soon as I know – in the stand-up and to the product owner – with the reason and a new estimate. The team then decides: get help, split the story, or move part of it back to the backlog. Unfinished work is never shown as done.

Q11. Which tools do you use as an ABAP developer?

ADT in Eclipse for development, SAP GUI for classic transactions and testing, ATC for quality checks, abapGit or gCTS where Git is used, Azure DevOps or Jira for the sprint, ServiceNow for tickets, and ChaRM or Cloud ALM for transports and approvals.

Q12. Tell me about a challenging development you delivered.

Use STAR: situation (project and problem), task (your goal), action (what you did – analysis, design, tools), result (measured outcome). Example: a 40-minute billing report reduced to 2 minutes by replacing nested SELECTs with a CDS view and ALV IDA, accepted in UAT.

05 · SAP Implementation Methodologies & Transformation Approaches

Q1. What were the phases of ASAP, and what was the Business Blueprint?

Project Preparation, Business Blueprint, Realization, Final Preparation, Go-Live & Support. The Business Blueprint was the signed-off document describing how every process would run in SAP; it froze the scope before the build, and later changes needed a change request.

Q2. What replaced ASAP, and when?

SAP Activate, in 2015 alongside S/4HANA. It replaced ASAP 8 for on-premise and SAP Launch for cloud projects and combines SAP Best Practices, the methodology and guided configuration and tools.

Q3. What are the three pillars of SAP Activate?

SAP Best Practices (ready-made scope items, today in SAP Signavio Process Navigator), the methodology (phases, deliverables, tasks in the Roadmap Viewer) and guided configuration and tools (Central Business Configuration or SPRO, SAP Cloud ALM).

Q4. What is the SAP Activate Roadmap Viewer?

A free SAP web tool that publishes the Activate roadmaps – public cloud, private cloud / RISE, transition to S/4HANA, upgrades, BTP and more – as phases, deliverables and tasks with accelerators. The same content can be loaded into SAP Cloud ALM as project tasks.

Q5. What does a developer do in Explore and in Realize?

Explore: join gap discussions, propose the extension option, estimate objects, write technical designs. Realize: build and unit test in sprints, code reviews and ATC, demos in sprint reviews, then fix SIT and UAT defects and build data-load programs.

Q6. What is a quality gate?

A formal checkpoint at the end of a phase: deliverables are reviewed, risks checked and the phase signed off before the project continues. In RISE projects SAP adds clean core quality gates tracked in SAP Cloud ALM.

Q7. Explain the main steps of a system conversion.

Readiness Check, Maintenance Planner, simplification item checks, custom code analysis and adaptation with ATC, the technical conversion with SUM (and DMO if the database is not yet HANA) including SPDD / SPAU, then follow-up activities such as finance data migration, reconciliation and regression tests – practised in mock conversions.

Q8. What is selective data transition, and what are shell conversion and mix and match?

A new S/4HANA system that takes over only selected configuration, code and data. Shell conversion converts a copy of production without business data, then transfers the chosen data – good when most of the solution is kept. Mix and match starts from a new install and brings over selected settings and objects – good when most is redesigned.

Q9. How do you choose between the three transition approaches?

By the need for process redesign, the value of the existing custom code, how much history must be kept, risk and effort, and the target (public cloud means new implementation). Mergers, carve-outs and partial history point to selective data transition.

Q10. What is RISE with SAP, and how does it differ from GROW with SAP?

Both are subscription offerings bundling cloud ERP, SAP BTP, tools and services in one contract. RISE (2021) targets mainly existing customers moving to the cloud, usually private cloud by conversion or new implementation. GROW (2023) targets new customers starting greenfield on S/4HANA Cloud Public Edition. Both use SAP Activate and the clean core principle.

Q11. In a RISE project, what does SAP do and what does the project team do?

SAP runs the infrastructure and the technical operation of the cloud system and applies software updates. The customer and the implementation partner do the implementation – configuration, extensions, integration, migration, testing – and the application support. The exact split is defined in the contract.

Q12. What does clean core mean for you as a developer on RISE?

No modifications; extensions only through released APIs and extension points – key-user extensibility, ABAP Cloud developer extensibility, or side-by-side on SAP BTP. In the private cloud classic code is still possible but rated by Clean Core Levels and checked with ATC.

Q13. Big bang or phased rollout – pros and cons?

Big bang: one cutover, no temporary interfaces, benefits at once – but the highest risk and a huge training and cutover effort. Phased (by module or site): lower risk and lessons learned between steps – but temporary interfaces, old and new systems in parallel and a longer programme.

Q14. What is a global template rollout?

One template with common processes, configuration and developments is built and proven in a pilot, then rolled out country by country with only local legal and business additions. For developers: build template objects configurable, keep local logic separate, and regression test template changes in all live countries.

Q15. What happens in a cutover, and what are your tasks?

Following a rehearsed runbook: freeze, stop legacy postings, import transports in sequence, manual settings, load configuration, master data, open items and balances, reconcile, then the go/no-go decision. My tasks: check transport order and logs, run and monitor load programs and jobs, and fix issues fast in hypercare.

Q16. Which tools support an SAP Activate project today?

SAP Cloud ALM for tasks, requirements, tests and deployments; SAP Signavio for process modelling and Process Insights; SAP LeanIX for enterprise architecture; SAP Readiness Check for conversions; the Roadmap Viewer and SAP Signavio Process Navigator for content. SAP Solution Manager 7.2 is still in use on-premise, with mainstream maintenance ending at the end of 2027.