Beyond ABAP / PM ABAP / Integration, Reporting & Analytics

Integration, Reporting & Analytics

PM ABAP · Logistics ·

Open the interactive lesson →
  1. The integration map
  2. MM: spare parts, purchase requisitions and external services
  3. FI/CO: order costs, settlement and investment orders
  4. PS: maintenance on WBS elements and shutdown projects
  5. QM: calibration and test equipment
  6. HR / CATS time confirmation and PP
  7. Mobile, IoT / predictive maintenance and external systems
  8. Standard reports and PMIS
  9. Embedded analytics and Fiori analytical apps
  10. Interview questions

A maintenance order never stands alone: it reserves spare parts and buys services in MM, collects costs and settles them in FI/CO, can belong to a PS project, triggers calibration inspections in QM, receives hours from HR / CATS and shares capacity and tools with PP. Outside the core it talks to mobile apps, IoT / predictive solutions on SAP BTP and external systems (GIS, SCADA, contractors). This page shows what each integration creates, which tables to read, and how PM data is reported – from IW38 lists and PMIS to Fiori analytics on CDS. Org structure and the overview map: page 01; master data and tables: page 02; the processes themselves: page 03; exits, BAPIs and APIs: page 05.

Part 1 – The integration map

The maintenance order in the middle: MM, FI/CO, PS, QM, HR/CATS, PP, mobile, APM on BTP and external systems around it

Module

What PM uses or creates there

Documents / tables

MM

Reservations for stock components, purchase requisitions for non-stock parts and external operations, goods issues to the order, service entry

RESB, EBAN / EBKN, EKKO / EKPO, MATDOC (S/4HANA)

FI/CO

Order costs (plan / actual / commitments), activity allocation, settlement to cost center, asset, WBS or AuC

ACDOCA (S/4HANA), COSP / COSS (ECC), COBRA / COBRB (settlement rule)

PS

Maintenance orders assigned to WBS elements (cost collection, budget), shutdown projects

PRPS, AFIH / AUFK with WBS element

QM

Calibration inspections: inspection lot (origin 14) from the maintenance order, usage decision on test equipment

QALS, QAVE, QMEL (shared notification table)

HR / CATS

People in work centers, time confirmation via CATS transferred to the order

CATSDB, CATSPM, AFRU

PP

Production resources / tools (PRTs), work center capacity, breakdowns of production lines

CRHD (work centers), KAKO (capacities), CRFH (PRT master)

Mobile / BTP / external

SAP Service and Asset Manager, SAP Asset Performance Management, GIS, SCADA, contractors

OData APIs, IDocs, measurement documents (IMRG)

The maintenance order is technically an order of category 30 in the same order framework as production orders (AUFK header, AFKO scheduling data, AFVC / AFVV operations) plus the PM-specific header AFIH. That is why many integration points – costing, settlement, capacity, reservations – work exactly like in production and CO internal orders.

Part 2 – MM: spare parts, purchase requisitions and external services

2.1 Components: stock, non-stock and text items

Item category

Meaning

What the order creates

Follow-on document

L – stock item

Spare part kept in the warehouse

Reservation (RESB)

Goods issue movement type 261 to the order (MIGO with the order or reservation); reversal 262

N – non-stock item

Part bought directly for this order

Purchase requisition (EBAN) with account assignment category F (order) in EBKN

PO → goods receipt posts the cost to the order

T – text item

Free-text component, no logistics

–

–

  • When reservations / requisitions are created is set per order type and on the order header (reservation / purchase requisition relevance): never, from release or immediately on save. Most companies use "from release" so planners can change the order freely before it is released.
  • Material availability check runs at order release (and on demand); missing parts block release or only warn, depending on customizing.
  • Spare parts come from the equipment / functional location BOM (page 02) – the planner picks them in the component list, so a clean BOM saves a lot of manual work.
  • S/4HANA: goods issues write MATDOC (MM ABAP › 03 Inventory); costs land in ACDOCA.

2.2 External processing and services

Control key (standard)

Operation type

MM document

PM01

Internal processing by own work center (hours, activity type)

None – confirmation posts activity allocation

PM02

External processing: a contractor does the whole operation (price, vendor, material group on the operation)

Purchase requisition → PO → goods / service receipt

PM03

External services with a service specification (planned service lines)

Purchase requisition with service lines → PO → service entry sheet

  • Contracts and info records on the operation give a fixed price; framework orders (limits) are common for contractor work that cannot be planned in detail.
  • The requisition carries the order as account assignment, so the commitment appears on the order at once and the actual cost when the GR or service entry sheet is posted.

2.3 Refurbishment of repairable spares

Expensive spares (pumps, motors) are repaired instead of scrapped. They use split valuation with valuation types such as new, refurbished and defective. A refurbishment order issues the defective part (261, valuation type defective) and receives it back as refurbished (101, valuation type refurbished); the price difference becomes the repair cost. Process variant: page 03 Part 6; valuation basics: MM ABAP › 03.

2.4 Reading order components in code

" Stock components (reservations) of one maintenance order
SELECT rsnum, rspos, matnr, werks, lgort, bdmng, enmng, meins, postp
FROM resb
WHERE aufnr = @p_aufnr
AND xloek = @abap_false                        " item not deleted
INTO TABLE @DATA(lt_components).

" Purchase requisitions assigned to the same order (non-stock items, external operations)
SELECT b~banfn, b~bnfpo, b~matnr, b~txz01, b~menge, b~meins, b~ebeln
FROM eban AS b
INNER JOIN ebkn AS k ON k~banfn = b~banfn AND k~bnfpo = b~bnfpo
WHERE k~aufnr = @p_aufnr
AND b~loekz = @space
INTO TABLE @DATA(lt_requisitions).

BDMNG is the requirement quantity, ENMNG the quantity already withdrawn, POSTP the item category (L / N / T). EBAN-EBELN is filled once a purchase order exists.

Part 3 – FI/CO: order costs, settlement and investment orders

Costs flow into the maintenance order from labour, stock parts, purchased parts and services, and are settled to cost center, asset, WBS or AuC

3.1 The three cost views of a maintenance order

Cost view

Where it comes from

Used for

Estimated costs

Entered manually by value category (rough estimate before planning)

Approval, budget check, early reporting

Planned costs

Calculated from operations (hours × activity price), components and external operations when the order is saved

Comparison plan vs actual, approval workflows

Actual costs

Confirmations (activity allocation), goods issues, invoices / GR for purchased items, service entry sheets

Settlement, cost analysis

Commitments

Open purchase requisitions and purchase orders

Budget availability control

  • Costs are grouped by value categories (cost elements → value categories in customizing) so the order shows labour, material, services separately; ECC keeps a PM cost summary by value category (table PMCO).
  • S/4HANA: actual postings are line items in the Universal Journal ACDOCA (field AUFNR = order); the CO totals tables of ECC are compatibility views. The Fiori app Actual Cost Analysis evaluates maintenance actual costs from the Universal Journal. Ledger and ACDOCA design: FICO ABAP › 02.

3.2 Settlement

A maintenance order is only a temporary cost collector. At period end the costs are settled to the real receiver according to the settlement rule (tables COBRA header, COBRB distribution rules). The mechanics (settlement profile, allocation structure, KO88 / KO8G) are the same as for CO internal orders – see FICO ABAP › 04.

Receiver

Typical case

Cost center (CTR)

Normal repair – the cost center of the equipment / functional location (default from the reference object)

Fixed asset (FXA)

Major overhaul that extends the asset life (capitalised)

WBS element (WBS)

Maintenance done within a project, shutdown / turnaround

Asset under construction (AuC)

Investment order – capitalisation after completion

Order / G/L account / profitability segment

Special cases (e.g. charge another order, sales order-related service)

  • The settlement rule is usually generated automatically from the reference object's cost center (settlement profile + strategy on the order type); user exit IWO10027 builds a custom rule (page 05).
  • Order life cycle and settlement: TECO (technically complete) → final settlement → CLSD (business complete). Costs posted after TECO (late invoices) are still settled; CLSD blocks further postings.
  • Collective settlement KO8G at month end, individual KO88 – both with settlement type periodic or full.

3.3 Investment orders and assets under construction

  • An order type with an investment profile (or an order assigned to an investment program position) is an investment order: its costs are capitalised, not expensed.
  • During the work the order settles periodically to an AuC (asset under construction) created automatically from the investment profile.
  • After completion a full settlement distributes the costs to the final fixed asset(s); the AuC is cleared. Budget and availability control can stop postings when the budget is used up.
  • Architect question: where is the line between repair (expense, cost center) and improvement (capitalise, asset)? It drives order types, settlement profiles and approval rules – agree it with finance early. Asset Accounting background: FICO ABAP › 03.

3.4 Reading the actual costs of an order (S/4HANA)

" Actual costs of one maintenance order per G/L account – Universal Journal, leading ledger
SELECT racct, rhcur, SUM( hsl ) AS amount
FROM acdoca
WHERE rldnr = '0L'
AND aufnr = @p_aufnr
GROUP BY racct, rhcur
INTO TABLE @DATA(lt_costs).

For reporting rather than single lookups prefer the analytical CDS views (Part 9), e.g. I_MaintOrderActualCostDataCube (classic API, not released for ABAP Cloud), which already know value categories and the order context.

Part 4 – PS: maintenance on WBS elements and shutdown projects

Option

When to choose it

Orders with cost center settlement only

Routine maintenance, no project budget

Orders assigned to WBS elements

Budgeted campaigns, capital-related work, shutdowns needing project controlling

Revision + planning buckets

Outage scheduling and backlog grouping, with or without PS

PS network + maintenance orders

Large turnarounds with engineering and project activities

Part 5 – QM: calibration and test equipment

Gauges, scales and measuring instruments must be checked regularly. PM schedules the work; QM records the results and decides whether the instrument is still usable. Process overview: page 03 Part 6; here the integration steps.

  • 1. The test instrument is an equipment of a test / measuring equipment category, often also a PRT (Part 6).
  • 2. A maintenance plan (time-based) uses a task list with inspection characteristics (master inspection characteristics) and a calibration order type.
  • 3. Scheduling creates the maintenance order; at release an inspection lot with origin 14 (plant maintenance) is created, with the equipment as inspection point.
  • 4. The technician records the measured values (results recording); the usage decision on the inspection lot says OK / not OK and can trigger follow-up actions (change the equipment status, create a notification for repair).
  • 5. The order is confirmed and technically completed; the next call is calculated by the plan.

PM and QM notifications share the notification framework (QMEL header, the same QQMA user exits – page 05). In S/4HANA 2025 the released CDS view I_MaintOrderInspectionLot links maintenance orders and their inspection lots. Inspection lots, results recording and usage decisions in depth: QM ABAP.

Part 6 – HR / CATS time confirmation and PP

6.1 Time confirmation

Channel

T-code / app

Result

Individual time confirmation

IW41 (IW42 overall completion confirmation, IW44 collective, IW48 with selection)

Confirmation (AFRU), activity allocation to the order, optional goods issue and TECO

Cross-application time sheet

CAT2 entry → CAT9 transfer to PM/CS (report RCATSTPM); CATA transfers to all target components

Time sheet records (CATSDB) → transfer table CATSPM → order confirmation

Mobile / Fiori

SAP Service and Asset Manager, Fiori Perform Maintenance Jobs

Same confirmation, posted through APIs

  • HR link: people (personnel numbers) are assigned to work centers; qualifications and availability feed capacity and assignment of technicians to operations.
  • Confirmed hours × the activity price of the work center's activity type = labour cost on the order (CO activity allocation).
  • CATS is preferred when the same people also book time to projects, cost centers or attendance – one entry, several target components. HR and payroll aspects: HR ABAP.

6.2 PP: tools, capacity and breakdowns

  • Production resources / tools (PRTs): equipment with PRT data (or materials / documents) assigned to operations – a test instrument or a special tool needed for the job.
  • Capacity: maintenance work centers have capacities like production work centers; operations create capacity requirements. Leveling uses the PP capacity tools (CM01 load, CM25 graphical planning table) or, in S/4HANA, the Fiori resource scheduling apps (page 06). Work centers and capacity planning in depth: PP ABAP.
  • Breakdown of a production line: a malfunction report with the breakdown flag records downtime – the basis of MTTR / MTBR (Part 8). Production planning must respect planned maintenance windows.
  • Production and maintenance orders share the order tables, so a custom report selecting AUFK must filter AUTYP = 30 (maintenance) or 10 (production).

Part 7 – Mobile, IoT / predictive maintenance and external systems

7.1 Mobile maintenance

Solution

What it is

SAP Service and Asset Manager

SAP's strategic native mobile app for maintenance and field service (iOS, Android, Windows), offline capable. Built with the SAP mobile development kit (MDK) and configured via SAP BTP mobile services; the SAP Mobile Add-On for SAP S/4HANA provides the OData services in the back end.

SAP Work Manager

Legacy – the older mobile product (SAP Mobile Platform based); successor SAP Service and Asset Manager.

SAP Fiori apps

Browser / tablet apps such as Perform Maintenance Jobs, Create Maintenance Request – online only.

Partner apps

Certified third-party mobile solutions using the same APIs.

7.2 IoT and predictive maintenance

  • Measuring points and counters (page 02) receive readings as measurement documents – manually, from mobile, or automatically from SCADA / historians via API_MEASUREMENTDOCUMENT or the RFC MEASUREM_DOCUM_RFC_SINGLE_001. Counter readings drive performance-based maintenance plans.
  • SAP Asset Performance Management (APM) on SAP BTP: condition monitoring with alerts, risk and criticality assessment, FMEA and reliability-centred maintenance, predictive models. It combines the earlier products SAP Asset Strategy and Performance Management and SAP Predictive Asset Insights (formerly SAP Predictive Maintenance and Service).
  • Typical flow: sensor data → APM alert → maintenance notification created in S/4HANA via API → planned order → results back to APM for reliability analysis.
  • SAP Business Network Asset Collaboration (formerly SAP Asset Intelligence Network, renamed 2022) shares equipment models, documents and maintenance strategies between operators, manufacturers and service providers.

7.3 External systems: GIS, SCADA, contractors

Integration

Typical technique

GIS (e.g. Esri ArcGIS) – network assets on a map

Technical objects synchronised via APIs; map UI calls S/4HANA to create notifications; linear asset data (start / end point) on the objects

SCADA / historian / MES

Readings → measurement documents; alarms → notifications (APIs or middleware); MES gets released orders

Contractors

PO from external operations; confirmations and service entry sheets back via portal or APIs

Outbound order data

IDoc IORDER01 (SM/PM order) created with IORD – there is no standard inbound order IDoc, inbound uses BAPIs or APIs (page 05)

Cloud APIs

OData APIs grouped in communication scenarios SAP_COM_0395 (master data), SAP_COM_0396 (maintenance planning), SAP_COM_0397 (maintenance processing), SAP_COM_0398 (execution)

Middleware (SAP Integration Suite / Cloud Integration) maps and routes these messages – see SAP BTP Integration Suite › 01 SAP Cloud Integration; IDoc and RFC basics: CORE ABAP › 07 Interfaces.

Part 8 – Standard reports and PMIS

8.1 List reports

T-code

List

Program / note

IW28 / IW29

Change / display notifications

RIQMEL20

IW38 / IW39

Change / display maintenance orders

RIAUFK20

IW37N

Order and operation list (planner's work list)

Operations with dates, work centers

IW47

Confirmations list

Hours per order / operation

IH06 / IH08

Functional location / equipment lists

RIIFLO20 / RIEQUI20

IP24

Scheduling overview of maintenance plans (list)

Calls due / called / completed

IK07 / IK17

Measuring points / measurement documents (display list)

Counter and condition history

IW13

Material where-used list for orders

Which parts went into which orders

  • These lists are ALV list editing reports with selection variants and layouts; mass changes (e.g. release, TECO) are possible from the change lists (IW38, IW28).
  • Developers often get "add field X to IW38" – first check the field selection and layout options, then a custom ALV report on AUFK / AFIH / AFKO / ILOA (page 05) instead of modifying the standard.

8.2 PMIS – Plant Maintenance Information System (legacy)

PMIS is part of the Logistics Information System (LIS): info structures filled at posting time with aggregated key figures. It still exists in S/4HANA but is legacy – new reporting uses CDS-based embedded analytics (Part 9).

Info structure

Content

Analysis

S061

Location and planning

MCI3 location, MCI4 planner group

S062

Object class and manufacturer

MCI1 object class, MCI2 manufacturer

S063

Damage analysis

MCI5

S065

Object statistics

MCI6

S070

Breakdown statistics

MCI7; MCJB MTTR / MTBR for equipment, MCJC for functional locations

S115

Cost evaluation

MCI8

S114

Vehicle consumption analysis

Fleet

  • MTTR / MTBR (mean time to repair / between repairs) need malfunction reports with the breakdown indicator and malfunction start / end times – a data-quality topic as much as a report.
  • Because LIS is filled at posting time, info structures must be set up again (statistical setup) after mass data loads or changed update rules.

Part 9 – Embedded analytics and Fiori analytical apps

PM reporting layers: transactional lists, legacy PMIS, embedded analytics on CDS views, strategic analytics in BW / SAP Analytics Cloud

Fiori app

What it shows

Technical Object Breakdowns

Breakdowns of technical objects with chart and table, drill-down to the notification (analytical list page)

Technical Object Damages

Damage codes per technical object from notifications

Maintenance Order Costs

Analytical list page on maintenance costs (query C_MaintOrderActualCostQ)

Actual Cost Analysis

Actual maintenance costs from the Universal Journal

Maintenance Planning Overview

Overview page for planners (backlog, due orders, KPIs)

Maintenance Backlog Overview / Resource Scheduling

Backlog by planning bucket, work center utilisation (page 06)

Released analytical CDS view

Content

I_MaintOrderActualCostDataCube

Actual costs of maintenance orders (classic API, not released for ABAP Cloud)

I_MaintOrderTechObjCube

Maintenance orders by technical object

I_LocationAnalysisCube

Analysis by location

I_MaintObjectPhaseLogCube / C_MaintObjectPhaseLogQuery

Process phases over time (phase model, page 06)

  • Key user: build own analytical queries on the released cubes with Custom Analytical Queries and show them in the Fiori launchpad – no ABAP.
  • Developer: own CDS cube / query views with @Analytics annotations on top of released I_ views (ABAP on HANA › 05 CDS Views); never on PMIS tables.
  • Strategic: cross-system KPIs (several plants on different systems, long history, APM data) belong in SAP BW/4HANA, SAP Datasphere or SAP Analytics Cloud.
  • Classic maintenance history lists (usage list of equipment, completed and historical orders) remain available alongside the Fiori apps.

Part 10 – Interview questions

Q1. What happens in MM when you add a stock and a non-stock component to a maintenance order?

The stock item (category L) creates a reservation in RESB, later consumed by goods issue 261 to the order. The non-stock item (N) creates a purchase requisition with account assignment F; the PO and goods receipt post the cost directly to the order. Timing depends on the reservation / requisition relevance setting (never, from release, immediately).

Q2. What is the difference between control keys PM01, PM02 and PM03?

PM01 is internal processing by an own work center (confirmation posts activity costs). PM02 is external processing of a whole operation – a purchase requisition is created. PM03 is external service with a service specification – requisition with service lines and a service entry sheet.

Q3. How are maintenance costs settled?

The order collects plan, commitment and actual costs; at period end KO8G (or KO88) settles them per settlement rule (COBRA / COBRB) to cost center, asset, WBS element or AuC. The rule is usually derived from the reference object's cost center; IWO10027 can build a custom rule. After TECO and final settlement the order is set to CLSD.

Q4. What is an investment order and how does it reach the fixed asset?

An order with an investment profile (or assigned to an investment program). It settles periodically to an asset under construction; after completion a full settlement distributes the costs to the final fixed assets. The decision repair vs capitalise is agreed with finance.

Q5. Where do you find maintenance order costs in S/4HANA?

As line items in ACDOCA (field AUFNR); the ECC totals tables are compatibility views. For reports use the cube I_MaintOrderActualCostDataCube (classic API, not released for ABAP Cloud) or the Fiori apps Maintenance Order Costs / Actual Cost Analysis.

Q6. How is a shutdown (turnaround) handled?

A PS project with WBS elements holds budget and controlling; maintenance orders are assigned to WBS elements and grouped by a revision for the outage window. Large turnarounds add networks for project activities. In S/4HANA event-based planning buckets help to plan and track the outage backlog.

Q7. Describe the calibration process with QM.

Test equipment has a maintenance plan with a task list containing inspection characteristics. The order release creates an inspection lot with origin 14; results are recorded and the usage decision triggers follow-up actions such as an equipment status change or a repair notification.

Q8. How do hours from CATS reach a maintenance order?

Time is entered in CAT2 (CATSDB), transferred with CAT9 (RCATSTPM) or CATA to the PM/CS interface table CATSPM, which creates order confirmations (AFRU) and activity allocations.

Q9. Which mobile solution does SAP offer for maintenance today?

SAP Service and Asset Manager: native, offline-capable app built with the mobile development kit on SAP BTP mobile services, connected through the SAP Mobile Add-On for S/4HANA. SAP Work Manager is the legacy product; Fiori apps cover online scenarios.

Q10. How does predictive maintenance integrate with S/4HANA?

Sensor and measurement data are analysed in SAP Asset Performance Management on BTP. Alerts or risk results create maintenance notifications in S/4HANA through APIs; readings are stored as measurement documents that can drive performance-based plans.

Q11. Which standard reports do you know for PM, and what is PMIS?

IW28/IW29 notifications, IW38/IW39 orders, IW37N operations, IH06/IH08 technical objects, IP24 plan scheduling overview. PMIS is the LIS-based information system (S061–S115, MCI1–MCI8, MCJB/MCJC for MTTR / MTBR) – legacy, replaced by CDS-based embedded analytics.

Q12. A user wants a breakdown KPI dashboard across two plants. How do you build it?

If both plants are in one S/4HANA system: Fiori Technical Object Breakdowns or a custom analytical query on released cubes. If data comes from several systems or needs long history and sensor data: SAP BW/4HANA, Datasphere or SAP Analytics Cloud. Either way ensure malfunction reports carry the breakdown flag and times.

🏠 Start Here · ◀ 03 · Processes & Config · 05 · Development ▶ · Sections: CORE ABAP | OOPS ABAP | ABAP on HANA | Clean Core | RAP | ABAP Points | SAP Fiori | SAPUI5 | Mobile Development (MDK) | BTP Foundations | BTP Development | CAP | SAP Build | ABAP on BTP | Integration Suite | SAP Business AI | SAP BASIS | Security | SAP SDLC