  1. ECC → S/4HANA: simplification items for PP
  2. New planning and manufacturing capabilities
  3. Editions: on-premise, private cloud, public cloud
  4. Data migration of PP objects
  5. Architect decisions
  6. Clean core for PP developments
  7. Roadmap and successor products
  8. Interview questions

This page is the architect's view of PP in S/4HANA: what changed against ECC (and what that means for custom code), which new planning options exist, what each edition offers, how PP data is migrated, and the design decisions a solution architect makes for manufacturing – plus clean-core rules for PP developments. The individual objects are explained on pages 01 – 05; this page connects them into decisions.

Part 1 – ECC → S/4HANA: simplification items for PP

The Simplification Item Catalog lists every change per release; the Readiness Check and the ATC S/4HANA checks show which ones hit your system and custom code (ABAP on HANA › 02 Migration to S/4HANA). The PP items an architect must know:

ECC versus S/4HANA for PP: classic MRP with MRP lists becomes MRP Live, storage location MRP becomes MRP areas, production version mandatory, SOP and long-term planning move to IBP and predictive MRP, APO PP/DS becomes embedded PP/DS, MKPF / MSEG becomes MATDOC, COEP becomes ACDOCA

Area

ECC

S/4HANA

Impact on custom code / design

MRP run

MD01 / MD02 / MD03 in ABAP

MRP Live MD01N in SAP HANA (classic MRP still callable on-premise)

Classic MRP BAdIs not called (page 05 Part 4); MD_MRP_FORCE_CLASSIC as fallback

MRP list

MDKP / MDTB, MD05 / MD06

Not written by MRP Live; MRP cockpit Fiori apps

Reports on MDTB must move to MD04 APIs, API_MRP_MATERIALS_SRV_01 or CDS

Planning file

MDVM / DBVM

PPH_DBVM

Direct reads of MDVM / DBVM break

Storage location MRP

Separately planned / excluded storage locations (MARD-DISKZ)

Not available – MRP areas

Conversion report MRP_AREA_STORAGE_LOC_MIGRATION; MRP area design (Part 5)

Production version

Optional (BOM selection by lot size / date possible)

Mandatory for BOM / routing selection

CS_BOM_PRODVER_MIGRATION02 creates missing versions

Creation indicators in MRP

Purchase requisition vs planned order, schedule lines yes / no

Removed in MRP Live: always purchase requisitions, or schedule lines if a scheduling agreement is the source

Variants and jobs using the old indicators must be changed

SOP (PP-SOP) and long-term planning

Standard functions

Compatibility scope – successors SAP IBP and predictive MRP

Plan the move; do not build new on them

Detailed scheduling

SAP APO PP/DS (separate system, CIF)

Embedded PP/DS

No CIF landscape; PP/DS flags on material and work center

Inventory / costs

MKPF / MSEG, COEP / COSS, BSEG

MATDOC, ACDOCA

Compatibility views exist, but new code reads the new tables or released views

Material number

18 characters

40 characters

Use …_LONG / …_EXTERNAL BAPI fields and no hard-coded lengths

Shop floor info system

LIS info structures (S0xx), MCP… reports

Not the target – COOIS, Fiori analytics, CDS

Rebuild LIS-based reports on CDS

  • Compatibility scope (SAP Note 2269324, compatibility scope matrix): functions that still run in S/4HANA but with limited usage rights; for on-premise licences these rights ended at the end of 2025 unless SAP's note says otherwise for an item. Check the current note and the Readiness Check before relying on any of them (SOP, LTP, graphical planning table CM21 – CM25, MRP lists).

Part 2 – New planning and manufacturing capabilities

Capability

What it does

When to propose it

MRP Live + MRP cockpit apps

Net requirements calculation in SAP HANA; Fiori apps for coverage and exception handling instead of MRP lists

Always – target architecture for MRP

Demand-driven MRP (DDMRP)

Decoupling buffers at strategic BOM levels; replenishment against buffer zones (S/4HANA since 1709)

Volatile demand, long lead times, bullwhip effect

Predictive MRP (pMRP)

Medium-term simulation of demand changes on capacity and suppliers (since 1909)

Replace long-term planning; S&OP-light without IBP

Embedded PP/DS

Finite, sequence-dependent scheduling and optimisation inside S/4HANA (since 1610)

Bottleneck resources, setup optimisation, capable-to-promise

Handover purchase requisitions

MRP controller hands requisitions over to purchasing explicitly; switched on per MRP group (since 2020)

When purchasing must not see unconfirmed MRP proposals

Event-based production accounting

WIP, variances, settlement in real time

Public cloud standard; on-premise when real-time production costs matter (page 04 Part 4)

EWM advanced production integration

Production material requests, staging, consumption in EWM

Plants with EWM-managed warehouses

SAP Digital Manufacturing

Cloud MES: execution, insights, operator UI

When a MES is needed and the plant fits the standard integration

Production engineering and operations (PEO)

Separately licensed S/4HANA solution for complex discrete manufacturing: version-controlled MBOM and shop floor routings, shop floor orders, work instructions

Engineer-heavy industries (e.g. aerospace, machinery)

Part 3 – Editions: on-premise, private cloud, public cloud

Topic

On-premise / private cloud

Public cloud

Scope

Full PP: discrete, PP-PI, REM, KANBAN, embedded PP/DS, classic transactions

Standard scope items, e.g. BJ5 make-to-stock discrete, BJE make-to-order, BJH repetitive, BJ8 make-to-stock process manufacturing; check the scope item list per release

Configuration

SPRO / IMG, any customizing

Central Business Configuration, self-service configuration UIs for allowed settings

Extensibility

Classic (exits, BAdIs, modifications) plus key-user and ABAP Cloud

Key user and developer extensibility on released objects only (ABAP Cloud)

Integration

IDocs, BAPIs / RFC, OData, SOAP, events

Released APIs and events, a limited set of IDocs; communication arrangements

Costing

Period-end or event-based

Event-based production accounting (3F0)

MTO stock

Valuated or non-valuated sales order stock

Valuated sales order stock only

Upgrades

Customer-driven (private cloud: contractual windows)

SAP-driven, twice a year

  • Private cloud (RISE) is technically the on-premise product run by SAP – same PP scope, same extensibility options, but clean core is expected contractually and by the upgrade cadence.
  • A greenfield public cloud project fits standard discrete, MTO and repetitive processes; heavy PP-PI with PI sheets, complex variant configuration or deep MES modifications usually point to private cloud.

Part 4 – Data migration of PP objects

In a greenfield project PP master data is loaded with the SAP S/4HANA Migration Cockpit (Fiori app Migrate Your Data, staging tables or files). Order matters because each object refers to the previous one.

Migration sequence for PP: material, work center, BOM, routing, production version, planned independent requirements, then open orders recreated, with cockpit objects and checks

Order

Object

Migration Cockpit object

Watch out for

1

Material (MRP, work scheduling views)

Product (material master) object

MRP type, lot size, MRP areas, strategy group – agreed with the business first

2

Work center / resource

Work center (with cost center and capacity)

Cost centers and activity types must exist (CO first)

3

Bill of material

Bill of material

Components must exist; usage and alternatives

4

Routing / master recipe

Routing (master recipe where offered)

Work centers, inspection characteristics and sampling procedures must exist

5

Production version

Production version

Mandatory in S/4HANA – one per BOM / routing combination

6

Planned independent requirements

PIR object where offered, or BAPI_REQUIREMENTS_CREATE

Usually reloaded from the planning tool

7

Open production / process orders

Usually not migrated

Finish in the legacy system or recreate open orders in S/4HANA (BAPI / CO01) with the remaining quantity

  • Check the object list of the Migration Cockpit for your release – objects and their templates differ between releases and between on-premise and public cloud.
  • System conversion (brownfield) keeps the data; the conversion reports do the PP work: MRP_AREA_STORAGE_LOC_MIGRATION, CS_BOM_PRODVER_MIGRATION02, PPH_SETUP_MRPRECORDS for the planning file. Custom code: replace MDKP / MDTB, MDVM / DBVM, MKPF / MSEG reads.
  • After the load: run MRP Live for a test plant, compare MD04 with the legacy system, and cost the products (CK40N) – wrong master data shows up immediately as wrong proposals or cost estimates.

Part 5 – Architect decisions

Architect decisions for PP: manufacturing type, planning tool, MRP procedure and lot sizing, plant and MRP area design, MES integration pattern, costing approach and warehouse staging, each with the main options

Decision

Options

Decide by

Manufacturing type

Discrete (production orders), PP-PI (process orders), REM (run schedules), KANBAN for components

Product and process: recipes and batches → PP-PI; stable high volume on lines → REM; changing lots with operations → discrete. Mixed per material is allowed

Planning tool

MRP Live only; + embedded PP/DS; + IBP; DDMRP; pMRP

Capacity bottlenecks (PP/DS), multi-site S&OP and forecasting (IBP), demand volatility (DDMRP), medium-term simulation (pMRP)

MRP type and lot sizing

PD MRP, VB / VM reorder point, VV forecast-based, ND; EX lot-for-lot, FX fixed, HB replenish to maximum, period lots

Value and consumption pattern (ABC / XYZ), setup cost vs storage cost, supplier constraints

Plant and MRP area design

One plant per site; MRP areas for separately planned storage locations and subcontractors

Legal and valuation needs (plant = valuation area), physical sites, separate planning responsibility

MES integration pattern

No MES (CO11N / Fiori), SAP Digital Manufacturing, third-party MES via APIs / IDocs / Integration Suite

Shop floor complexity, genealogy, machine integration; who posts goods movements

Costing approach

Product cost by order, by period (product cost collector), sales order controlling; period-end vs event-based

Manufacturing type, reporting needs, edition

Execution automation

Backflush vs manual issue; automatic GR; milestone confirmation; order release automatic or manual

Data quality of BOMs, discipline on the shop floor, need for real-time stock

Warehouse staging

Inventory management only, EWM advanced production integration, KANBAN

Warehouse size and automation, line-side storage

Typical trade-offs to explain in an interview

  • Backflush everything reduces postings but makes stock wrong when BOMs are inaccurate; COGI becomes a daily task.
  • Embedded PP/DS gives finite scheduling but needs clean master data (setup matrices, resources) and planners trained in a new tool; plain MRP Live + capacity leveling is cheaper.
  • One plant vs several plants at one site: separate plants separate valuation and planning but add stock transfers; MRP areas often give the planning separation without a new plant.
  • MES posts goods movements vs S/4HANA backflushes: decide per order type; never both.

Part 6 – Clean core for PP developments

Clean core means: extend through released, upgrade-stable interfaces, keep modifications out (Clean Core › 01 Clean Core). For PP the typical classic objects map to these targets:

Classic (ECC habit)

Clean-core target

PPCO / CONFPP customer exits, WORKORDER_… BAdIs

Released BAdIs via Custom Logic or ABAP Cloud where offered; otherwise keep on-premise with a documented exception, or move the rule to the integration layer

Z reports with SELECTs on AFKO, PLAF, RESB, MDTB

Released CDS views (I_PlannedOrder, I_ManufacturingOrder …), analytical queries, Fiori elements

Z programs calling BAPI_PRODORD_… BAPIs via RFC from outside

Released OData APIs (SAP_COM_0104) and business events

Custom MES IDoc logic in user exits

SAP Digital Manufacturing standard integration or Integration Suite mapping outside the core

Classic MRP BAdIs

AMDP BAdIs for MRP Live; fewer customizations of the planning logic

Appends on AFKO / AFPO with screen modifications

Custom Fields app where a business context exists; otherwise a side table keyed by order

Copied standard print programs for shop floor papers

Output forms on released interfaces where supported

  • Side-by-side on SAP BTP for whole new functions (operator apps, quality dashboards, AI scrap prediction) on released APIs and events – ③ SAP BTP section group.

Part 7 – Roadmap and successor products

Legacy

Successor

PP-SOP (Flexible Planning, info structures)

SAP IBP for Supply Chain (S&OP, demand, supply)

Long-term planning (LTP)

Predictive MRP; IBP for multi-site scenarios

SAP APO PP/DS, SNP, DP

Embedded PP/DS, IBP

Classic MRP with MRP lists

MRP Live + MRP cockpit apps

SAP ME / SAP MII

SAP Digital Manufacturing

Classic WM staging

EWM (embedded or decentralised)

LIS shop floor information system

Embedded analytics (CDS), SAP Analytics Cloud, Datasphere

  • SAP's innovation for PP goes into S/4HANA public cloud first (two releases a year) and reaches private cloud / on-premise with the next release (since 2023 every two years, with feature packs in between); the What's New documents list the changes per release.

Part 8 – Interview questions

Q1. What are the main PP simplification items in S/4HANA?

MRP Live (MD01N) without MRP lists, the single planning file PPH_DBVM, MRP areas instead of storage location MRP, mandatory production versions, removed MRP creation indicators, SOP and long-term planning in compatibility scope with IBP and pMRP as successors, embedded PP/DS instead of APO, MATDOC and ACDOCA, 40-character material numbers.

Q2. What changes for custom code that reads MRP results?

MDKP / MDTB are not written by MRP Live, so such reports show old data. Read live data through the stock / requirements list API (MD_STOCK_REQUIREMENTS_LIST_API), API_MRP_MATERIALS_SRV_01 or released CDS views; planning file reads move to PPH_DBVM.

Q3. Why is the production version mandatory and how do you prepare for it?

S/4HANA selects BOM and routing only through the production version in MRP and order creation. Before conversion run CS_BOM_PRODVER_MIGRATION02 to generate missing versions; in greenfield load them with the Migration Cockpit after BOMs and routings.

Q4. When would you recommend embedded PP/DS, IBP, DDMRP or pMRP?

Embedded PP/DS for finite, sequence-dependent scheduling of bottlenecks; IBP for collaborative S&OP, statistical forecasting and multi-site supply planning; DDMRP for volatile demand with long lead times; pMRP for medium-term what-if simulation instead of long-term planning.

Q5. What is the difference between the editions for manufacturing?

On-premise and private cloud have the full PP scope (PP-PI, REM, KANBAN, PP/DS) with classic and clean-core extensibility. Public cloud offers standard scope items such as BJ5, BJE, BJH and BJ8, released extensibility only, event-based production accounting and valuated sales order stock only.

Q6. In which order do you migrate PP master data?

Material, work centers (after cost centers and activity types), BOMs, routings / master recipes, production versions, then PIRs. Open orders are usually completed in the legacy system or recreated.

Q7. How do you choose between discrete, process and repetitive manufacturing?

By the product and process: recipes, batches and quantities in kg or litres → PP-PI; stable high volume on lines → REM with period costing; changing lots with routings → discrete. A plant can mix them per material.

Q8. How would you design MRP areas for a plant?

Keep the plant MRP area as default; add storage location MRP areas only where a location must be planned separately (e.g. a remote spare-parts store) and subcontractor MRP areas for provided components. Each storage location belongs to at most one MRP area.

Q9. Which MES integration pattern would you choose?

With SAP Digital Manufacturing the standard integration (order IDocs out, APIs back) via Integration Suite and Cloud Connector; for a third-party MES the released OData APIs and events, IDocs where the MES expects them. In both cases one system owns goods movements and confirmations.

Q10. How do you keep PP developments clean-core?

Released CDS views for reading, released APIs and events for integration, released BAdIs or Custom Logic for logic, Custom Fields for fields, side-by-side apps on BTP; classic exits only on-premise with a documented exception and a plan to replace them.

Q11. What happens to SOP and long-term planning in S/4HANA?

They are compatibility scope with limited usage rights. The successors are SAP IBP for S&OP and demand / supply planning and predictive MRP for medium-term simulation.

Q12. What would you check first in a brownfield PP conversion?

The Readiness Check and simplification items (storage location MRP, production versions, MRP lists, compatibility scope usage), custom code reading MDTB, MDVM, MKPF / MSEG and COEP, classic MRP BAdIs that MRP Live will not call, and APO / CIF dependencies.

🏠 Start Here · ◀ 05 · Development · 07 · Interview Questions ▶ · Sections: CORE ABAP | OOPS ABAP | ABAP on HANA | Clean Core | RAP | ABAP Points | SAP Fiori | SAPUI5 | Mobile Development (MDK) | BTP Foundations | BTP Development | CAP | SAP Build | ABAP on BTP | Integration Suite | SAP Business AI | SAP BASIS | Security | SAP SDLC