  1. Master data overview and the data model
  2. Material master: MRP and work scheduling views
  3. Bill of material (BOM)
  4. Work center and resource
  5. Routing and master recipe
  6. Production version
  7. Planned independent requirements
  8. Planned orders, production orders and confirmations
  9. MRP results and the planning file: ECC vs S/4HANA
  10. Released CDS views
  11. Interview questions

PP runs on five master data objects – material master (MRP and work scheduling views), bill of material, work center / resource, routing / master recipe and production version – plus the demand in planned independent requirements. From them MRP creates planned orders, which become production or process orders with operations, component reservations and confirmations. This page gives every object with its key tables, the important fields, the ECC → S/4HANA changes and the released CDS views. Processes and customizing: page 03; enhancements, BAPIs and APIs: page 05; the general CDS and table techniques: ABAP on HANA › 05 CDS Views and ABAP Points › Tables.

Part 1 – Master data overview and the data model

Master data must exist in this order before the first MRP run: material → BOM and work centers → routing (it refers to work centers and BOM components) → production version (it combines a BOM alternative and a routing) → PIRs.

Object

Create / change / display

Main tables

Key

Material (MRP, work scheduling views)

MM01 / MM02 / MM03

MARA, MARC, MDMA, MBEW

MATNR + WERKS

BOM

CS01 / CS02 / CS03

MAST, STKO, STPO, STAS, STZU

STLTY + STLNR + STLAL

Work center

CR01 / CR02 / CR03

CRHD, CRCO, CRCA, KAKO, CRTX

OBJTY + OBJID (ARBPL per plant)

Resource (PP-PI)

CRC1 / CRC2 / CRC3

Same tables as work center

OBJTY + OBJID

Routing

CA01 / CA02 / CA03

MAPL, PLKO, PLAS, PLPO, PLMZ

PLNTY + PLNNR + PLNAL

Master recipe (PP-PI)

C201 / C202 / C203

Same task list tables, PLNTY = 2

PLNTY + PLNNR + PLNAL

Production version

C223 (also MM02, work scheduling view)

MKAL

MATNR + WERKS + VERID

PIR

MD61 / MD62 / MD63

PBIM, PBED

BDZEI (pointer)

PP data model: material MARC links to BOM via MAST, STKO, STPO and to routing via MAPL, PLKO, PLAS, PLPO with work center CRHD; production version MKAL combines BOM alternative and routing; planned order PLAF and production order AUFK, AFKO, AFPO, AFVC, RESB, AFRU

Part 2 – Material master: MRP and work scheduling views

PP data of the material is plant-specific and lives in MARC (MRP-area-specific overrides in MDMA). It is maintained in the views MRP 1 – MRP 4 and Work scheduling of MM01 / MM02. General material data (MARA, MAKT, MARM) and valuation (MBEW): MM ABAP page 01.

View

What it controls

MRP 1

MRP type, MRP controller, reorder point, lot size and its limits, MRP group

MRP 2

Procurement type, special procurement, storage locations, in-house production time, planned delivery time, GR processing time, scheduling margin key, safety stock, backflush

MRP 3

Strategy group, consumption mode and periods, availability check group, planning material / forecast settings

MRP 4

BOM selection method, individual / collective requirements, REM profile and repetitive manufacturing flag, discontinuation

Work scheduling

Production scheduler, production scheduling profile, under / overdelivery tolerance, production versions

2.1 Important MARC fields

Field

Meaning

Typical values

DISMM

MRP type – which planning procedure

PD MRP, VB manual reorder point, VM automatic reorder point, VV forecast-based, M0 – M4 MPS, ND no planning

DISPO

MRP controller

Key from T024D

DISLS

Lot-sizing procedure

EX lot-for-lot, FX fixed, HB replenish to maximum, TB / WB / MB daily / weekly / monthly lots

BSTMI / BSTMA / BSTFE / BSTRF

Minimum / maximum / fixed lot size, rounding value

Quantities

BESKZ

Procurement type

E in-house, F external, X both

SOBSL

Special procurement key (plant-specific customizing)

e.g. subcontracting, stock transfer from another plant, phantom assembly, direct production, production in another plant

STRGR

Strategy group → planning strategies

10, 11, 20, 40, 50 …

DZEIT / PLIFZ / WEBAZ

In-house production time / planned delivery time / GR processing time (days)

Used in basic date scheduling

FHORI

Scheduling margin key: floats before / after production, opening period

Key

EISBE / MINBE

Safety stock / reorder point

Quantities

LGPRO / LGFSB

Issue storage location for production / default location for external procurement

Storage location

RGEKZ

Backflush indicator

1 always, 2 work center decides

SBDKZ

Individual / collective requirements

blank individual and collective, 1 individual only, 2 collective only

ALTSL

Selection method for BOM alternatives

ECC: by lot size, validity date or production version · S/4HANA: production version only

MTVFP

Availability check group (ATP)

e.g. 02 individual requirements

VRMOD / VINT1 / VINT2

Consumption mode, backward / forward consumption period (days)

Used when sales orders consume PIRs

FEVOR / SFCPF

Production scheduler / production scheduling profile

Keys

SAUFT / SFEPR

Repetitive manufacturing allowed / REM profile

Flag / key

FXHOR

Planning time fence (days)

Number

  • The MRP type decides whether and how a material is planned; the procurement type whether MRP creates a planned order for production or a purchase requisition; the lot size how much; the special procurement key refines both (e.g. a phantom assembly is exploded but never produced on its own).
  • The low-level code (MARA-DISST) is set by the system from the BOM structure; it is cross-plant.

Part 3 – Bill of material (BOM)

A BOM lists the components, with quantities, needed to make a base quantity of an assembly. MRP explodes it to create dependent requirements; the production order copies it into reservations (RESB); product costing uses it for the material costs.

Concept

Meaning

Values / field

BOM category

What the BOM belongs to

STLTY: M material, E equipment, T functional location, D document, K sales order, P WBS element, S standard

BOM usage

Which area uses it

STLAN: 1 production, 2 engineering / design, 3 universal, 5 sales and distribution, 6 costing

Alternative BOM

Several BOMs for one material (e.g. by lot size or line), up to 99

STLAL; chosen through the production version in S/4HANA (ECC: also by the selection method MARC-ALTSL)

Item category

Type of component line

POSTP: L stock item, N non-stock, R variable-size, T text, D document, K class item

Variant BOM / super BOM

Several similar products share one BOM; configurable products use object dependencies

Variant configuration

Phantom assembly

Logical grouping exploded into its components, never produced as such

Special procurement key on the component

3.1 BOM tables

Table

Content

Key fields

Important fields

MAST

Material-to-BOM link

MATNR, WERKS, STLAN, STLNR, STLAL

Which BOM number belongs to the material, plant and usage

STKO

BOM header (per alternative)

STLTY, STLNR, STLAL, STKOZ

BMENG base quantity, STLST status, DATUV valid from

STPO

BOM items

STLTY, STLNR, STLKN, STPOZ

IDNRK component, MENGE, MEINS, POSTP, POSNR, AUSCH component scrap

STAS

Which items belong to which alternative

STLTY, STLNR, STLAL, STLKN, STASZ

Needed because items can be shared by alternatives

STZU

BOM permanent data (once per BOM number)

STLTY, STLNR

Number of alternatives

  • Read path: material + plant + usage → MAST (STLNR, STLAL) → STKO (header of the alternative) → STAS (item nodes of that alternative) → STPO (items). Validity uses DATUV and change numbers (AENNR).
  • Explosion: CS11 level by level, CS12 multi-level, CS13 summarized, CS15 where-used. In code a multi-level explosion is done with function module CS_BOM_EXPL_MAT_V2 (page 05), not by recursive SELECTs.

Part 4 – Work center and resource

A work center (PP-PI: resource) is where an operation is performed. It supplies four kinds of data to the operation: basic data (standard value key, default control key), capacity (available hours, shifts), scheduling (formulas that turn standard values into durations) and costing (cost center + activity types, so confirmations post activity costs).

Table

Content

Key / important fields

CRHD

Work center header

OBJTY ('A' = work center), OBJID internal key, ARBPL work center, WERKS, VERWE category, VGWTS standard value key

CRTX

Work center texts

OBJTY, OBJID, SPRAS, KTEXT

CRCO

Cost center assignment (per validity period)

OBJTY, OBJID, KOSTL, LSTAR activity types

CRCA

Capacity allocation: work center → capacity

OBJID → KAPID

KAKO

Capacity header

KAPID, KAPAR capacity category, working times, utilization

KAPA

Shift / interval data of a capacity

KAPID, VERSN, …

  • Operations, orders and capacity requirements point to the work center through OBJID (e.g. PLPO-ARBID, AFVC-ARBID) – join CRHD on OBJID, not on ARBPL.
  • Standard value key SAP1 (setup, machine, labour) is the common default: the routing operation enters a value per parameter and the formulas of the work center calculate duration, capacity load and costs.
  • Capacity requirements of planned and production orders: KBKO (header) and KBED (records per operation and capacity).

Part 5 – Routing and master recipe

A routing lists the operations to make a material: sequence, work center, control key, standard values and, optionally, which BOM components are consumed in which operation. In PP-PI the equivalent is the master recipe with operations and phases on resources. Both are task lists stored in the same tables and distinguished by the task list type.

Task list type (PLNTY)

Object

T-code

N

Routing (discrete)

CA01 – CA03

R

Rate routing (REM, quantity per time)

CA21 – CA23

S

Reference operation set (reused in routings)

CA11 – CA13

2

Master recipe (PP-PI)

C201 – C203

Q

Inspection plan (QM)

QP01 – QP03

Table

Content

Key / important fields

MAPL

Material-to-task list allocation

MATNR, WERKS, PLNTY, PLNNR, PLNAL

PLKO

Task list header (group + group counter)

PLNTY, PLNNR, PLNAL, ZAEHL; VERWE usage, STATU status, LOSVN / LOSBS lot size range

PLAS

Selection of operations per group counter

PLNTY, PLNNR, PLNAL, PLNFL sequence, PLNKN node

PLPO

Operations

PLNTY, PLNNR, PLNKN, ZAEHL; VORNR operation, ARBID work center, STEUS control key, VGW01 – VGW06 standard values, LTXA1 text

PLMZ

Component allocation (BOM item → operation)

Links STPO items to PLPO operations

PLFL

Sequences (standard, parallel, alternative)

PLNTY, PLNNR, PLNAL, PLNFL

  • The control key (PLPO-STEUS) says how an operation behaves: scheduled, costed, confirmation required, printed, external processing. Standard keys: PP01 internal processing, PP02 external processing.
  • Read path: material → MAPL (group PLNNR, group counter PLNAL) → PLKO → PLAS → PLPO – the same pattern as MAST → STKO → STAS → STPO for BOMs.

Part 6 – Production version

A production version says which BOM alternative and which routing / master recipe are used to produce a material, for which lot-size range and validity period. Maintain it with C223 (mass maintenance) or in the work scheduling view; table MKAL (key MATNR, WERKS, VERID).

MKAL field

Meaning

VERID / TEXT1

Production version key and text

ADATU / BDATU

Valid from / valid to

BSTMI / BSTMA

Lot-size range

STLAN / STLAL

BOM usage and alternative

PLNTY / PLNNR / ALNAL

Task list type, group and group counter

MDV01

Production line (REM)

MKSP

Lock indicator (version may not be used)

  • ECC: the production version is optional – BOM alternatives can also be selected by lot size or date (MARC-ALTSL). S/4HANA: the production version is mandatory for the BOM and routing selection in MRP, planned orders and production orders – without one, no BOM or routing alternative is found. During conversion SAP's report CS_BOM_PRODVER_MIGRATION02 generates missing production versions.
  • Planned orders and production orders store the chosen version (PLAF-VERID, AFPO-VERID).

Part 7 – Planned independent requirements

PIRs are the forecast quantities per material, plant and date that drive make-to-stock and assemble-to-order planning. They are created in MD61 (change MD62, display MD63), copied from SOP / IBP or uploaded, and consumed by sales orders according to the planning strategy.

Table

Content

Key / important fields

PBIM

PIR header per material, plant, requirement type and version

MATNR, WERKS, BEDAE requirements type, VERSB version, PBDNR; BDZEI pointer to the schedule lines

PBED

PIR schedule lines (quantity per date / period)

BDZEI, PDATU date, PLNMG planned quantity, ENTLU period indicator

PBHI

Change history of PIRs

BDZEI, …

  • Requirements type depends on the strategy: LSF (strategy 10), VSF (40), VSE (50).
  • Only the active version (typically 00) is relevant for MRP; other versions are for simulation.
  • Consumption: a sales order reduces the PIR within the consumption periods (MARC-VRMOD, VINT1, VINT2) so that demand is not counted twice.

Part 8 – Planned orders, production orders and confirmations

Planned order PLAF converts into production order: AUFK master, AFKO header, AFPO item, AFVC / AFVV operations, RESB components, JEST status, AFRU confirmations, goods movements in MATDOC and costs in ACDOCA, with the linking fields AUFNR, AUFPL, RSNUM, OBJNR, RUECK

8.1 Planned order

PLAF holds every planned order (number PLNUM). Main fields: MATNR, PLWRK planning plant, PAART order type, BESKZ / SOBES procurement, GSMNG quantity, PSTTR / PEDTR start / finish, PERTR opening date, VERID production version, AUFFX firming flag, DISPO. Its components are reservations in RESB (dependent requirements, linked through RSNUM). When converted, the planned order is deleted.

8.2 Production and process order

Table

Content

Key / important fields

AUFK

Order master (shared with CO internal orders, maintenance orders)

AUFNR; AUART order type, AUTYP category (10 production, 40 process), WERKS, OBJNR status object, KDAUF / KDPOS sales order

AFKO

PP order header

AUFNR; PLNBEZ material, GAMNG total quantity, GSTRP / GLTRP basic start / finish, AUFPL routing number of operations, RSNUM reservation, DISPO, FEVOR

AFPO

Order item (the product; co-products possible)

AUFNR, POSNR; MATNR, PSMNG quantity, WEMNG goods received, VERID, LGORT, DWERK

AFVC

Order operations

AUFPL, APLZL; VORNR, ARBID work center, STEUS, LTXA1, RUECK confirmation number

AFVV

Operation quantities, values, dates

AUFPL, APLZL; MGVRG quantity, VGW01 – VGW06, scheduled dates

RESB

Component reservations / dependent requirements

RSNUM, RSPOS; MATNR, BDMNG requirement, ENMNG withdrawn, LGORT, RGEKZ backflush, AUFNR

JEST / TJ02T

Object status of the order / status texts

OBJNR, STAT, INACT

CAUFV

Database view AUFK + AFKO (classic way to read order headers)

AUFNR

System status

Code

Meaning

CRTD

I0001

Created – not yet executable

REL

I0002

Released – goods movements and confirmations allowed

PCNF / CNF

I0010 / I0009

Partially / finally confirmed

DLV

I0012

Delivered – full goods receipt posted

TECO

I0045

Technically completed – reservations and capacity requirements are cleared

CLSD

I0046

Closed – no more postings

8.3 Confirmations and goods movements

Table

Content

Key / important fields

AFRU

Order confirmations

RUECK, RMZHL counter; AUFNR, VORNR, LMNGA yield, XMNGA scrap, ISM01 – ISM06 activities, BUDAT, STOKZ reversed

AFFW

Goods movements with errors from confirmations / backflush (reprocessed in COGI)

Material, plant, error message

MATDOC

Goods issue 261 and goods receipt 101 for the order (ECC: MKPF / MSEG)

AUFNR, BWART, MATNR

ACDOCA

Order costs and stock values in S/4HANA (ECC: COEP / COSS / COSP, BSEG)

Object number, account

Example – components of a production order with withdrawn quantity

SELECT FROM afko
INNER JOIN afpo ON afpo~aufnr = afko~aufnr
INNER JOIN resb ON resb~rsnum = afko~rsnum
FIELDS afko~aufnr, afpo~matnr AS product, afko~gamng,
resb~rspos, resb~matnr AS component, resb~bdmng, resb~enmng, resb~meins
WHERE afko~aufnr = @lv_aufnr
AND afpo~posnr = '0001'                   " main product
AND resb~xloek = @abap_false              " item not deleted
INTO TABLE @DATA(lt_components).
  • Number ranges: planned orders and MRP have their own number ranges in MRP customizing; production and process orders draw their numbers from the order type's number range group (shared with other order categories); confirmation numbers per operation (AFVC-RUECK).

Part 9 – MRP results and the planning file: ECC vs S/4HANA

ECC: planning file MDVM / DBVM, MRP list MDKP / MDTB, MKPF / MSEG, COEP; S/4HANA: planning file PPH_DBVM, MRP Live in SAP HANA without MRP lists, stock / requirements list built at runtime, MATDOC, ACDOCA, production version mandatory, MRP areas instead of storage location MRP

Object

ECC

S/4HANA

Planning file – which materials need planning

MDVM / DBVM (plant / MRP area entries)

Single table PPH_DBVM; low-level code read from the material during the run; consistency reports, PPH_SETUP_MRPRECORDS initial setup

MRP list – saved result of the last run

MDKP header, MDTB lines; displayed in MD05 / MD06

MRP Live (MD01N) does not write MRP lists; analyse with MD04 or the Fiori apps

Stock / requirements list (MD04)

Built at runtime from orders, reservations, stock

Same principle, read from the in-memory tables; also in Fiori (Monitor Material Coverage; stock / requirements list as a tab in Manage Material Coverage)

Requirements and receipts

PLAF, RESB, EBAN, EKET, VBBE, PBED, AFPO …

Unchanged tables; stock from MATDOC

Storage location MRP

MARD-DISKZ separately planned / excluded

Not available – MRP areas (MDMA)

  • Classic MRP (MD01, MD02, MD03 with MRP list option) still writes MDKP / MDTB on-premise; custom reports that read MDTB therefore break or show old data once the plant moves to MRP Live. Read current results through MD04 logic (function module MD_STOCK_REQUIREMENTS_LIST_API or BAPI_MATERIAL_STOCK_REQ_LIST, page 05) or released CDS views.
  • Report PPH_CHECK_MRP_ON_HANA (older releases; shown as obsolete in newer ones) lists materials that MRP Live cannot plan in SAP HANA and the reason; those are planned with the classic ABAP logic in the same run.

Part 10 – Released CDS views

New code and analytics should read PP data through the virtual data model (VDM) instead of the tables. The basic interface views below are released (C1 contract) in current S/4HANA releases. ADT (API state of the view) and the View Browser app show the release state per system – the list grows with every release and some views differ between private and public cloud.

Object

Interface view

Main table behind it

Planned order

I_PlannedOrder

PLAF

Production order (and internal order data)

I_ProductionOrder

AUFK / AFKO

Production order operation

I_ProductionOrderOperation_2

AFVC / AFVV

Production order status (system and user status)

I_MfgOrderWithStatus

JEST

Manufacturing order (production and process orders together)

I_ManufacturingOrder with item / operation views

AUFK / AFKO / AFPO

Bill of material

I_BillOfMaterial, I_BillOfMaterialItem, I_MaterialBOMLink

STKO, STPO, MAST

Work center

I_WorkCenter

CRHD (+ CRCO)

Routing operation

I_RoutingOperation

PLPO

Capacity requirements

I_CapacityRequirement

KBKO / KBED

  • For write access use the APIs and RAP business objects (production order, planned order, BOM, routing, PIR APIs) – page 05. How to build on released views: ABAP on HANA › 05 CDS Views.
" Open planned orders of one MRP controller via the released VDM view
SELECT FROM i_plannedorder
FIELDS plannedorder, material, productionplant, totalquantity,
plannedorderstartdate, plannedorderenddate
WHERE productionplant = @lv_plant
AND mrpcontroller   = @lv_dispo
ORDER BY plannedorderstartdate
INTO TABLE @DATA(lt_planned).

Part 11 – Interview questions

Q1. Which material master fields matter most for MRP?

MRP type (DISMM), MRP controller (DISPO), lot size (DISLS + limits), procurement type (BESKZ), special procurement (SOBSL), in-house production / planned delivery time, safety stock, strategy group (STRGR) and the BOM selection method – all in MARC (MDMA per MRP area).

Q2. Explain the BOM tables and how you read a BOM.

MAST links material, plant and usage to the BOM number and alternative; STKO is the header per alternative; STAS assigns items to alternatives; STPO holds the items. For multi-level explosion use CS_BOM_EXPL_MAT_V2 instead of own recursion.

Q3. What are BOM usage and BOM category?

Usage (STLAN) says which area the BOM is for – 1 production, 2 engineering, 5 sales, 6 costing. Category (STLTY) says what it belongs to – M material, K sales order, P WBS element, E equipment.

Q4. Which tables hold routings and how are they linked to the work center?

MAPL (material allocation), PLKO (header), PLAS (operation selection), PLPO (operations). PLPO-ARBID points to CRHD-OBJID, the internal work center key.

Q5. What is a production version and why is it mandatory in S/4HANA?

MKAL combines a BOM alternative and a routing for a lot-size range and validity. In S/4HANA MRP and order creation select BOM and routing only through the production version, so every produced material needs one; in ECC it was optional (BOM alternative also by lot size or date via MARC-ALTSL).

Q6. Name the production order tables.

AUFK master, AFKO header, AFPO item, AFVC / AFVV operations, RESB components, JEST status, AFRU confirmations; goods movements in MATDOC and costs in ACDOCA (ECC MKPF / MSEG and COEP).

Q7. How do you find whether a production order is released or technically completed?

Read JEST with the order's OBJNR (AUFK-OBJNR) and INACT = space: I0002 REL, I0045 TECO, I0046 CLSD. In code prefer function module STATUS_READ or the released view I_MfgOrderWithStatus.

Q8. What is the difference between PLAF and AFKO / AFPO?

PLAF is the planned order – an MRP proposal that MRP may change or delete. AFKO / AFPO is the production order – a binding execution document with operations, reservations and costs.

Q9. Which tables store PIRs?

PBIM (header per material, plant, requirements type, version) and PBED (schedule lines with date and quantity); history in PBHI.

Q10. What changed in the MRP tables in S/4HANA?

The planning file is one table PPH_DBVM; MRP Live does not write MRP lists (MDKP / MDTB); storage location MRP is replaced by MRP areas; stock comes from MATDOC.

Q11. Why should a custom report use CDS views instead of AFKO / PLAF?

Released views are a stable contract (upgrade-safe, cloud-ready), carry semantics and associations, work in public cloud where tables are not accessible, and push the joins to SAP HANA.

🏠 Start Here · ◀ 01 · Overview & Org · 03 · Processes & Config ▶ · Sections: CORE ABAP | OOPS ABAP | ABAP on HANA | Clean Core | RAP | ABAP Points | SAP Fiori | SAPUI5 | Mobile Development (MDK) | BTP Foundations | BTP Development | CAP | SAP Build | ABAP on BTP | Integration Suite | SAP Business AI | SAP BASIS | Security | SAP SDLC

Functional: FICO ABAP | TRM ABAP | VIM | SAP BIS | SD ABAP | MM ABAP | PP ABAP | QM ABAP | PM ABAP | PS ABAP | EWM | TM ABAP | GTM ABAP | EHS ABAP | HR ABAP | BW | SAP Datasphere | SAP Business Data Cloud | SAP MDG | SAP Analytics Cloud | SAP Ariba | SAP CX | SAP IBP